Northvolt – modules are built in height in two levels

Prior to the delivery of electric steam boilers totalling 6 MW, the three ModCon® modular buildings will be installed on the factory site to check and ensure compatibility between modules. Testing of the HVAC system and electrical and control system takes place at the Jaco factory before delivery to the Northvolt battery factory outside Skellefteå.